2022-01-07
Through high temperature and low air pressure testing machine Manufacturer's technical personnel testing and debugging, we need to pay attention to the following points.
1. Confirmation of the test chamber at the beginning of the test chamber;2. The test is prohibited from opening the door;
3. Do test
Do not check the door sealing bar before the box, do not lead the power cord or test line from the gate;
5. Time maintenance
High temperature low air pressure testing machine To check the sealing of the door seal, check if the sealing strip of the door has breaks or defects.Whether there is a seal is not strict (with A4 paper cuts 20 ~ 30mm note, place it at the door sealing strip, close the door, need to force pull out to pass).
You can Send Message or email info@qinsun-lab.com to us, we will reply tu you within 24 hours.Now tell us your need,there will be more favorable prices!
Home |
Product |
About |
Contact
Email: info@qinsun-lab.com
No. 2578 Gu Dai Road, Shanghai